The project in detail
We first visited this project when it was little more than a plot of ground, meeting with a very excited customer and discussing the plans for what would eventually become this large new-build home. Once construction was underway, we returned to decorate the property throughout, working alongside the build and moving from one area to the next as rooms became available. We were responsible for the complete decorating process, from initially sealing the bare plaster through to preparation, finish coats and final snagging.
The ceilings were sealed using Dulux Trade Supermatt before being finished in Dulux Trade Vinyl Matt White, while the walls throughout were finished in Dulux Trade Diamond Matt Emulsion. The new woodwork received extensive preparation, with knots sealed before priming, filling, caulking and undercoating as required, followed by the final top coats. The timber doors were finished with a clear Diamond Varnish to protect them while retaining the natural appearance of the wood, and the bathroom ceilings were finished in Zinsser Perma-White Matt for additional protection in higher-moisture areas. It is difficult for photographs alone to show the scale of such a large, sweeping property, so we would particularly recommend watching the project video using the link provided for a much better look around the completed house.